Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Search in posts
Search in pages
Filter by Categories
Mini Review
Original Article
Research Article
Review Article
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Search in posts
Search in pages
Filter by Categories
Mini Review
Original Article
Research Article
Review Article
View/Download PDF

Translate this page into:

Research Article
2 (
2
); 147-152

On Minimizing Machines Rental Cost Using Heptagonal Fuzzy Processing Time

Licence
This is an open-access article distributed under the terms of the Creative Commons Attribution-Non Commercial-Share Alike 4.0 License, which allows others to remix, transform, and build upon the work non-commercially, as long as the author is credited and the new creations are licensed under the identical terms.
Disclaimer:
This article was originally published by Qassim University and was migrated to Scientific Scholar after the change of Publisher.

Abstract

This paper is concerned with minimizing the total rental cost of special structure three phases flow shop scheduling problem. We propose a new approach to solve such problem with heptagonal fuzzy processing time. The heptagonal fuzzy processing time is processed without transforming it to a deterministic number. For demonstrating the efficiency of the proposed approach, a numerical example is illustrated.


Fulltext Views
160

PDF downloads
134
View/Download PDF
Download Citations
BibTeX
RIS
Show Sections